Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Then the user should set any additional event that comes after the initial delivery of the product., as per the above example.

...

  1. Log in to the CRM instance and from the left side menu, scroll down and click Campaign Management

  2. Then click on Settings

  3. From the Settings page, go to user should go:
    - To the top right side of the page and click on the + Create new button

  4. The user is redirected to the New Campaign Settings page

  5. For to create a new campaign
    - Click on the campaign name to access its settings page, for the already existing campaigns, the user can click on the campaign name to access its settings page

...

  1. On the Campaign Settings page, go to the right side of the page to the right side menu and click on Products

  2. From the Products section, select the product to add to the campaign

  3. Select Continuity on the Sale Type field

  4. Select the Sales Models that was previously built for the subscription sales

  5. On the Product Sale Type, you can leave it blank. Otherwise, select one of the two choices available: Regular or Presale Pop display only

    Image Added
  6. Click on the Add button and the product and the other configurations will be listed in the below table

  7. Then go to the right side of the product row and click on the Shipping Info button

    Image Added
  8. From theShipping Methods tab switch to ON the one you need and click on update

    Image Added
  9. To save the changes on the campaign, go to the right side of the page and click on the Save button

...

A subscription order presents the below information, which differs from a regular hard-sale order.

...

In the Product & Shipping History, there is the Stop Continuity Charges button, with which the user can hold stop the subscription, or else after the current order, the customer will not receive the product anymore

...

and to release resume the subscription, once it has been hold, then the user should click on the Start Continuity Charges button

...