1. Prepare 3 Price Variations per these grids – BA - Jennie Hang
IK Split Test Results - https://drive.google.com/open?id=1CYD26Qps9g7i9zxdcdOY965E3jq2svuL2. Upsell Split Tests will be shared between the 3 campaigns3. Please make sure Warranty is a separate page per – /drive/u/1/folders/1fZks6sxmRpdtli7Z6jnd1JngUkuMp7-L
KPI Priority - CVR
CURRENT PRIORITIES |
Priority | Change | Steps | Goals | Ticket Links | Completion Status | Deployment ETA | Extra Notes |
---|
3 | Pricing Variations | - Please prepare 3 pricing variations per here
- Set them up as separate offers in Everflow and Everflow Mail
| Have a variety of different price points available to affiliates
Determine best initial price point | Jira Legacy |
---|
server | System JIRA |
---|
columns | key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution |
---|
serverId | b5f78b4b-8603-3879-a97e-a16b5dacbf76 |
---|
key | DFSB-3260 |
---|
|
Jira Legacy |
---|
server | System JIRA |
---|
serverId | b5f78b4b-8603-3879-a97e-a16b5dacbf76 |
---|
key | DFSB-3261 |
---|
|
| PENDING | 9/18 |
|
|
|
|
|
|
|
|
|
2 | Upsell Test | - Please prepare standard upsell templates for the 2 extra upsells noted in the first tab here
- Send Tim final links for split testing
| Determine best upsell for the funnel | Jira Legacy |
---|
server | System JIRA |
---|
serverId | b5f78b4b-8603-3879-a97e-a16b5dacbf76 |
---|
key | DFSB-3309 |
---|
|
| LIVE | 9/26 | Split-test live |
| DC Test | Variant now testing (A/B) | Determine best checkout for the funnel | N/A | LIVE |
|
|
COMPLETED |
Priority | Change | Steps | Goals | Ticket Links | Completion Status | Deployment ETA | Extra Notes |
---|
| Upgrade Upsell | - Prepare upgrade with 24K product, pricing found in the grid links above
- Use this template to prepare design assets - https://www.
|
...
...